Bart Headquarters: Transforming Oakland's Skyline
Details
Location:
Oakland, California
Owner:
Architect:
General Contractor:
Turner Construction
Specialty Contractors:
Broadway Mechanical
FMG and Company
Category:
Workplace, Transportation
Awards:
ENR California's 2022 Northern California Regional Best Interior/Tenant Improvement Project
Accreditation:
LEED Gold
Description
AlfaTech spearheaded the mechanical, electrical, and plumbing (MEP) engineering design for this landmark 10-story office building nestled in Oakland's vibrant Uptown neighborhood. The project involved the warm core and shell retrofit of a 244,000 SF existing office building, including ground-level parking and future retail spaces.
Highlights
-
Implemented a cutting-edge water-cooled Variable Refrigerant Flow (VRF) system coupled with dedicated outside air units, ensuring optimal energy efficiency.
-
All services are strategically capped at each floor, facilitating seamless connectivity for future tenant needs.
-
Redesigned the building façade with high-efficiency glazing and window wall systems, minimizing energy consumption and enhancing aesthetics.
-
Provided energy modeling and comprehensive commissioning services to meet the rigorous standards for LEED certification, demonstrating our commitment to sustainability.